You define your workshop’s steps the way you do them: mixing, baking, packing. Zindra keeps track of what goes in, what comes out, from which batch and what each box costs.
30-day trial · no card
Each thing you make is a line: its raw materials at the start, your processes in the order you do them and packing at the end. At a glance, what comes out of each step and how much of it there is.
From the flour that arrives to the box that gets delivered: each part of the workshop has its place, and they all work with the same data.
There are no processes written in advance. You set them, and each one says what goes in, which machines it uses and how much comes out.
Mixing · Butter biscuits
The process sheet
What goes in
Machinery
What comes out
You say how many batches you’re putting in and Zindra works out what each step will give, down to the boxes that come out at the end.
ORD-2026-0014
Butter biscuits · 3 batches
Batches used in mixing
The cost comes from each process sheet, at today’s prices. When butter goes up, you see it in what the box costs.
Cost per batch
At today’s prices
Raw materials
Flour, butter, sugar and egg
€63.75
Machinery
Mixer 20 min · oven 45 min
€1.50
Packaging
84 boxes and 84 labels
€30.24
A whole batch
€95.49
Each 250 g box
€1.14
If a supplier warns you about a consignment, in a minute you know what you used that material in and who you delivered it to.
Batch GM-1114
252 boxes · expires 14/05/2027
← Where it comes from
Wheat flour
L-2611 · Harinera del Sur
Butter
L-2598 · Lácteos Sierra
Batches
Mixing and baking on 14/11
Where it went →
How much there is of each material, from which batch and when it expires. And from the supplier order to the shelf, without writing anything down twice.
Raw materials
Warehouse: Workshop
Wheat flour
2 batches · expires 02/2027
180 kg
ButterBelow minimum
1 batch · expires 12/2026
64 kg
Sugar
1 batch · expires 09/2027
90 kg
Liquid egg
2 batches · expires 28/11/2026
40 kg
Shops, cafés and restaurants, each with their own prices. And if you sell online, the store shows what there really is.
Nobody copies data from one place to another: each step leaves the next one done.
Each moment has its module, and they all share the same data.
The ones your industry uses come switched on. Turn any on or off, say how many people you are and see the monthly total. The Workshop module is enabled on request and is not part of this total.
Tap a module to see what it includes.
Each thing you make: biscuits, sandwich loaves, nougat. It has its raw materials, the processes it goes through in the order you do them, and packing at the end. You can have as many lines as products.
No. Zindra doesn’t come with processes written in: you define them, with the name you give them in your workshop. The only fixed thing is that the line starts with its raw materials and ends in packing.
Yes. It works for any product made in steps and in batches: biscuits, chocolate, preserves, fresh pasta, teas.
From each process sheet: raw materials at your supplier’s price, the machines’ electricity for the minutes they run, and the packaging. Each step carries the cost of the ones before, so packing gives you what the finished unit costs.
Yes. For each batch you see which run it came from, which batch of each material it contains and from which supplier, and which customers it was delivered to.
The batch doesn’t start: Zindra tells you what’s missing and how much. You can still plan an order for another day, even if the purchase hasn’t arrived yet.
It’s turned on on request, and we give it to you when we talk. The prices for the rest of Zindra are on the pricing page.
Yes. You connect your store once and Zindra publishes the stock of what you make there and takes each order off the warehouse.
Yes. The workshop and the premises share warehouse, purchasing and team, and each has its own screens. You turn on the hospitality or retail modules in the same company.